Is NEON Safe? Our Security Scan of Neon EVM Token

September 24, 2026 · Security · CryptoRefuge Team

Is NEON Safe? Our Security Scan of Neon EVM Token

Neon EVM Token (NEON) scores 70/100 (grade A) on CryptoRefuge's RugShield security scan, with a composite scam-risk reading of 30% — we ran its contract through the scanner as it drew attention. Here is the full breakdown.

What the scan found

On Solana (SPL), no honeypot signal was detected on the sell function. Buy tax is 0% and sell tax is 0%. The mint function is still active (supply can be inflated), and ownership is not renounced. Tracked liquidity is $55,518 (0% locked), held across 16,033 holders, with the top 10 controlling 80.7%.

What this means for you

The core contract checks look reasonable, but a passing scan is not a guarantee — trends reverse and liquidity can move.

Risk factors flagged:

Positive signals:

Verify it yourself

This is automated on-chain analysis, not financial advice. See the full live result on the Neon EVM Token scan page, run any token through the free RugShield scanner, or read the complete token security checklist.


Data: CryptoRefuge RugShield on-chain scan via GoPlus. Always do your own research.